自动盐水注射机操作注意事项 |
添加时间:2019/2/26 11:06:32 浏览次数: |
自动盐水注射机操作注意事项:
Matters needing attention in operation of automatic brine injection machine:
1、机器运行之前,需首先作如下检查。
1, before the machine runs, it is necessary to make the following checks first.
2、盐水管道、压缩机管道是否连接牢靠。
2, brine pipe, compressor pipeline is reliable.
3、电源线是否连接正常,鸭肉盐水注射机厂家,表面是否有破损。
3, if the power cord is connected properly, is there any damage on the surface of the Duck salt injection machine manufacturer?
4、各安全开关,控制按钮是否完好,各安全门是否关闭到位。
4, the safety switches, control buttons are intact, whether the safety doors are closed in place.
5、盐水槽内是否有盐水。
5. Is there any brine in the brine tank?
6、针头、过滤网、输送带安装是否到位。
6, needle, filter screen, conveyor belt installation is in place.
7、检查、调整压缩空气压力为6bar,压肉板的气压为6bar,鸭肉盐水注射机多少钱,注射针头的推进气压为1.5-3.2bar(跟据产品的不同而调节,产品越疏松,压力越小,通常调整为2.5 bar)。
7. Check and adjust the pressure of compressed air to 6 bar, the pressure of meat plate to 6 bar, how much is the duckzhijiang.75ix.com gemobeng.75ix.com hdshangbiao.75ix.comshangbiaoq.75ix.comjixiet.75ix.comguseji.75ix.com saline injection machine, and the pressure of the needle to push is 1.5-3.2 bar (according to the different products, the more loose the product, the less the pressure, usually adjusted to 2.5 bar).
8、根据产品和注射率的不同调整设置盐水泵的压力与针头注射率和活动床的步进距离(盐水泵的压力不得超过4 bar,该压力和针头注射频率必须在运转状态下调整)。
8. Adjust the pressure of the brine pump to the needle injection rate and the step distance of the movable bed according to the product and injection rate (the pressure of the brine pump must not exceed 4 bar, and the pressure and the needle injection frequency must be adjusted in the running state). |
上一页 精密注射机在控制方面的特点 |
下一页 手动盐水注射机设备介绍 |
Copyright © 技术支持:遨游网络